# Jlcpcb

> Markdown twin of https://roboterminal.app/companies/jlcpcb · https://roboterminal.app/companies/jlcpcb.md

## On shared sources

- [Hugging Face](https://roboterminal.app/companies/hugging-face) (3)
- [Bambu Lab](https://roboterminal.app/companies/bambu-lab) (2)
- [Xometry](https://roboterminal.app/companies/xometry) (2)
- [Anthropic](https://roboterminal.app/companies/anthropic) (1)
- [Claude Code](https://roboterminal.app/companies/claude-code) (1)
- [LeRobot](https://roboterminal.app/companies/lerobot) (1)
- [OpenAI](https://roboterminal.app/companies/openai) (1)
- [Physical Intelligence](https://roboterminal.app/companies/pi) (1)
- [Protolabs](https://roboterminal.app/companies/protolabs) (1)
- [SendCutSend](https://roboterminal.app/companies/sendcutsend) (1)
- [Unitree](https://roboterminal.app/companies/unitree) (1)

## Pulse

- [@michellelsun on X](https://x.com/michellelsun/status/2109255694260056538)
  The era of vibe manufacturing is here @gregisenberg describes a workflow from an idea to its first physical test. How? Print a prototype first, check the fit before committing to production. For anyon…
- [@smsehy on X](https://x.com/smsehy/status/2107788518286397664)
  The 'Vibe Manufacturing Playbook' nails the iterative process of bringing physical products to life. From precise measurements to prototyping and scaling, the emphasis on real-world engineering constr…
- [@smsehy on X](https://x.com/smsehy/status/2107786800177754197)
  Renting design is the easy part. Qualification cycles for safety-critical actuators run 14 to 18 months per configuration. Tooling validation, supplier audits, IEC 62443 compliance. That pipeline does…

---

Source: Roboterminal · https://roboterminal.app/companies/jlcpcb.md